Skip to content
AI data-centre power

Power equipment already takes about 30% of an AI rack. As racks head towards a megawatt, NVIDIA has said this will leave no room in the rack for compute. QPT's converters are designed to pack up to 5× the power into the same space. And our IP scales even further.

What changes

More power. Same space. Same efficiency.

System performance
Up to 5×
the power density of today's converters

Far more power from the same space.

System cost
More compute
in every rack

Space goes back to the processors. More compute from the same space.

System efficiency
Same
high efficiency data centres expect

Density goes up without giving efficiency back.

Why now

The 800 V switch has a date.

NVIDIA has set a date for 800 V racks. The racks shipping in 2027 are being designed now.

Under the hood · qIPM-DC

High power density for 800 V supplies today, from an architecture that scales to 1500 V.

qIPM-DC
Take this further

Designing 800 V racks? Let's talk.