AI data-centre power
Power equipment already takes about 30% of an AI rack. As racks head towards a megawatt, NVIDIA has said this will leave no room in the rack for compute. QPT's converters are designed to pack up to 5× the power into the same space. And our IP scales even further.
$50Bn in data-centre power by 2030.
What changes
More power. Same space. Same efficiency.
System performance
Up to 5×
the power density of today's converters
Far more power from the same space.
System cost
More compute
in every rack
Space goes back to the processors, in halls that already exist.
System efficiency
Same
high efficiency data centres expect
Density goes up without giving efficiency back.
Why now
The 800 V switch has a date.
NVIDIA has set a date for 800 V racks. The racks shipping in 2027 are being designed now.
Under the hood · qIPM-DC
High power density for 800 V supplies, built from stacked qMicroModules. A scalable solution to 1500 V and beyond.